Weather and Meteorological Conditions
during Reporting Month |
Appendix
L |
|
Appendix M |
|
Appendix N |
|
|
|
i.
The
Civil Engineering and Development Department HKSAR has appointed MateriaLab
Consultants Limited (MCL) to undertake the Environmental Team services for the
Project and implement the EM&A works.
ii.
This
Monthly EM&A report presents the environmental monitoring and audit works
for the period between 1 July 2017 and 31 July 2017. As informed by the
Contractor, major activities in the reporting month were:
Temporary diversion for drainage works;
Temporary diversion for CLP cable at CH6+560;
Temporary diversion for sewage rising main;
Construction of temporary diversion road for Shing Cheong
Road (TTA Stage 2);
Setup of temporary barging point;
Excavation of drainage pipe and manhole (M206 to M207);
Seawall Modification Works;
Construction of tunnel box structure;
D-wall construction works;
Guide wall construction works;
Construction of socket H-pile;
Pumping test for Zone 3;
Excavation and ELS construction; and
Installation of dewatering, observation and recharging wells.
Breaches of the Action and Limit Levels
iii.
No Action / Limit
Level exceedance was recorded for 24-hr TSP and construction noise at KTD1a,
KTD2a and KER1b in the reporting month.
Complaint,
Notification of Summons and Successful Prosecution
iv.
A complaint received
on 16 July 2017 was referred from the 1823 regarding the muddy water discharge
at Kai Tak River by CEDD project.
The notification of complaint was received by ET on 27 July 2017.
v.
No notification of
summons and successful prosecution were received in the reporting month.
Reporting
Changes
vi.
There was no
reporting change in the reporting month.
Future
Key Issues
vii. The key issues to be considered in the
coming reporting month include:
Potential environmental impacts arising from
the above construction activities are mainly associated with construction dust,
construction noise, water quality, waste management and landscape and visual
impact.